CONSTRUCTION
World Bank
Scope of works; This called for Mass Excavation of the basement, Brickwork façade, CMU block unity’s, Roof insulations, 0.30 glass U value, bullet resistant glass plus 15 minutes intruder shop fronts, suspender garden planters, > 0.65 DCOF tilling, fabric operable partitions (concealed), cavity glass windows BR7,FB7,SR3-SR4 doors plus windows, BMS installation, access control, perimeter inclusion system, ICT installation, irrigation systems, N2-security gates, PWD lifts, passenger plus cargo lifts, Armstrong timber ceilings, aluminum doors, fire rated doors, precast windows cells motorized roller blinds etc. LED lights , AHU movable office partitions complete security command center etc. Fuel tank plus generator. |
Project Details
- Year Completed
- Client
- Location
- 2023
- International Bank for Reconstruction and Development.
- 1818 H Street, N.W Washington D.C. 20433