The scope of works included: mass excavation & earthworks, reinforced concrete foundation/machine bases/tank bases for heavy equipment and plant and very large tanks and vessels, structural steelwork to roofs, aluminum, steel, and timber doors, waterproofing, stormwater drainage, fire fighting, electrical installations, air conditioning installation, office/laboratory fittings, weighbridge, civil works, mass excavation / reinforced concrete to Lagoon area.Facilities include: Fermentation Section, Chemical Storage, Distillation Section, Daily Receiver Storage Section, Bulk Storage Section, Cooling Tower, Water Treatment Plant, Loading Section, Biomethanation Section, Vinasse Lagoon Area, Boiler And Turbine, Composting Plant, Fire Fighting, Transformer, Mcc Room For Wtp In Rcc, Mcc Room For Biomethanation In Rcc, Mcc Room Biocomposting In Rcc and Bio Digester |
|