CONSTRUCTION
KAKIRA BOTTLING PLANT
This called for Demolition works and these included dismantling of any section, size & shape at any height or depth. Including finishing, grinding, stacking/disposing the debris within an initial lead of 500m, taking every safety precaution, loading and carting away debris arising from the demolition. approved imported murram fill in 200mm thick layers, 150mm thick bed of hand packed stone base, well rolled and compacted, sand blinding over surfaces of hardcore, insecticide treatment on top of hardcore surfaces with approved anti-termite chemical. Damp Proof Membrane, Reinforced concrete class 25;(20mm aggregate) steel Reinforcement, application of floor hardener, sealing of expansion joints. |
Project Details
- Year Completed
- Client
- Location
- 2023
- KAKIRA SUGAR LTD
- P.O.BOX 121, JINJA-UGANDA